MBTA Dorchester Avenue Bridge Replacement

Project Details

Owner

MBTA

SERVICES

PROJECT CONTROLS
PUBLIC OUTREACH

Project Description

City Point Partners is providing cost estimating and public outreach support during the design and construction for the replacement of this bridge built in 1925 which spans existing MBTA tracks including the Red Line, commuter rail, and freight rail service. The Dorchester Avenue bridge, with heavy vehicular traffic, is a very congested site, requiring full bridge closure and detour. All rail services must remain operational during construction and the Von Hillern Street retaining wall also needs to be protected and supported during construction. Additionally, the project will add a commuter rail track serving the Old Colony line.

HOW MAY WE HELP?

Tell us a little about your needs or request a call back from one of our engineers.