MBTA South Station Platform Approaches and Tower 1 Interlocking

MBTA South Station Platform Approaches and Tower 1 Interlocking

MBTA South Station Platform Approaches and Tower 1 Interlocking

Project Details

Owner

MBTA

SERVICES
Cost Estimating
Scheduling

City Point Partners is leading the construction phase services, conducting schedule reviews, Time Impact Analyses, and Independent Cost Estimates for change orders in support of the major track and signal work planned for South Station. A new master signal house is being installed as well as upgrades to switches, communications, and interlocking infrastructure resulting in improved reliability, resiliency, and security of nine Commuter Rail Lines and Amtrak’s Northeast Corridor. This project addresses the immediate state-of-good-repair needs of the current train service while also supporting future growth. 

HOW MAY WE HELP?

Tell us a little about your needs or request a call back from one of our engineers.

MBTA New Quincy Bus Maintenance Facility

MBTA New Quincy Bus Maintenance Facility

MBTA New Quincy Bus Maintenance Facility

Project Details

Owner

MBTA

SERVICES

PROJECT CONTROLS
PUBLIC OUTREACH

Image Courtesy of STV, Inc.

Project Description

This new bus maintenance facility in Quincy is replacing the MBTA’s existing bus maintenance facility, the oldest in the MBTA system.

The existing facility lacked the technology and space to support the new Battery Electric Buses (BEB’s) that the MBTA is instituting to lessen the environmental impact. The new facility will be 350,000 sf and consist of four interconnected structures for the storage and maintenance of 120 buses with 11 service/maintenance bays, and offices. Specialty MEP and building communications systems infrastructure are required, as well as unique building equipment and restrooms, locker rooms, and vertical transportation.

During the design phase, HDR | City Point Partners provided cost estimating, scheduling, and public outreach services. During the construction phase, we are reviewing the contractor’s monthly schedule updates and coordinating and scheduling the testing and commissioning activities as an on-site office engineer.

HOW MAY WE HELP?

Tell us a little about your needs or request a call back from one of our engineers.

MBTA Dorchester Avenue Bridge Replacement

MBTA Dorchester Avenue Bridge Replacement

MBTA Dorchester Avenue Bridge Replacement

Project Details

Owner

MBTA

SERVICES

PROJECT CONTROLS
PUBLIC OUTREACH

Project Description

City Point Partners is providing cost estimating and public outreach support during the design and construction for the replacement of this bridge built in 1925 which spans existing MBTA tracks including the Red Line, commuter rail, and freight rail service. The Dorchester Avenue bridge, with heavy vehicular traffic, is a very congested site, requiring full bridge closure and detour. All rail services must remain operational during construction and the Von Hillern Street retaining wall also needs to be protected and supported during construction. Additionally, the project will add a commuter rail track serving the Old Colony line.

HOW MAY WE HELP?

Tell us a little about your needs or request a call back from one of our engineers.

I-95 Viaduct Northbound Design-Build

I-95 Viaduct Northbound Design-Build

I-95 Viaduct Northbound Design-Build

Project Details

Owner
Rhode Island Department of Transportation
Skills
COST ESTIMATING
SCHEDULE OVERSIGHT

Project Description

The I‐95 Viaduct Northbound project is a large bridge replacement that also includes ramps and other structures. The project will restore structural sufficiency and alleviate chronic traffic congestion on Interstate 95 through downtown Providence and includes demolition and replacement of bridges, roadway reconstruction, retaining wall construction, and drainage system installation. Work is taking place over the Woonasquatucket River, Amtrak’s New England Corridor, and various city streets in Providence.

City Point Partners is part of the Owner’s Representative team supporting RIDOT providing cost and scheduling technical support including reviews and analysis during the design and construction phases through completion.

HOW MAY WE HELP?

Tell us a little about your needs or request a call back from one of our engineers.

Town of Rockport New Department of Public Works Facility

Town of Rockport New Department of Public Works Facility

Town of Rockport New Department of Public Works Facility

Project Details

Owner

Town of Rockport

Skills

OWNER’s PROJECT MANAGEMENT
PROJECT CONTROLS
CONSTRUCTION SERVICES

Project Description

As the Owner’s Project Manager, HDR | City Point Partners is overseeing construction services for a new 24,000 sf Department of Public Works (DPW) facility.

The Town is changing the existing site to increase the separation between the DPW buildings and other Town-owned facilities adjacent to the site such as the Police Station and Water Department buildings.

HDR | City Point Partners oversaw the pre-construction, and is overseeing construction activities at the site; reviewing schedules, cost estimates and contractor’s schedule of values; providing project documentation, budget development, bid review, pre-inspection work for quality assurance; and scheduling inspections.